Friday, April 9, 2010
Walk The Line
Spent the morning walking the proposed waterline with the engineer from Bush and Gudgell. Close to 830 feet of waterline must be installed to bring in fire protection to the new lot. On the design front things are getting closer to being done with schematic design. Our best guess for construction plans is July 15th. With any luck we will be breaking ground in August of this summer.
Wednesday, March 17, 2010
Preliminary Plat Approval
Finally a meeting the angry neighborhood didn't show up to. Although long the meeting was quit pleasant. Unanimous approval of our subdivision! Hip-Hip Hooray. Pressing forward towards Final Plat now. Wish us luck.
Thursday, March 4, 2010
Uprising- We and Dem

= rebellion, and also refers to a killer roots reggae album by Bob Marley.
Just our luck that our soon-to-be neighbors know this concept too and our idealistic desire to nest has turned into a neighborhood upprising. Still not convinced that we have the legal right to access our lot from a public road the fight goes on and has turned into another two weeks of delay. The facts and records are there, a survey was presented with all the legal descriptions. The city engineer was there with similar facts but we are now guilty until proven innocent.
From the Uprising album in the song We and Dem it says
"we no know how we and dem a-go work this out,oy!
we no know how we and dem a-go work it out."
Wednesday, February 17, 2010
Conceptual Plans Accepted
The Holladay Planning Commission has adopted our conceptual plan for the subdivision. Two weeks to prepare for the Preliminary plot plan. This public forum was a real eye opener in the process. We are glad its over and we are moving on. "Welcome to the neighborhood"
Saturday, February 13, 2010
Neighborhood Meeting
Well that didn't go so good. Being a peaceful warrior I have no idea how people can get so upset and down right angry about land protection. Our current plans for a 2975sq foot home is absolutely the best use of the land we have. In it's current state the pasture property could be broken into 3, 1/2 acre lots, with a house on each. One single family dwelling for the possibility of three is what we are trying to do. Brought to the attention of the neighbors this comment was considered a "threat". Preserve the most amount of the property for open space and gardens. An idea which was brought to our attention was the thought that we ultimately wanted a road connecting one side of the property to the road on the other side making it a thoroughfare. Wow! Talk about destroying a beautiful place. In the words of a wise cranky old guy "Serenity Now"
Thursday, February 11, 2010
Plans

We have plans. Our choice combined the overall concepts we have been working with along. 2975 square feet, separate adult and children zones. Super energy efficient. Trombe wall. Bringing outdoors in. Neighborhood meeting tonight letting everyone around us whats happening with our subdivision process. Planning Commission Meeting next week. Specific floor plans and renderings coming soon.
Thursday, February 4, 2010
Another Year and few months
but who is really counting anymore. The neighbors have all agreed on the boundary lines of the property and "Holladay, we have lift off". The subdivision process is next along with will serve letters from utilities. If we are lucky we will be able to break ground this summer. For the last few years it has seemed like things were just around the corner from happening. Now I really believe they are happening. Thanks you Imbue Design for hanging in there.
Tuesday, November 4, 2008
Renderings of the Pasture House
Well the property lines are still being worked on but the design process by the Imbue Design team is well underway. We are excited to get pictures up for everyone to see. Tell us what yo think? Six months from breaking ground and I have butterflies just thinking about it. Keeping our focus onthe future build gets us through the long subdivision process.
Kichen
South-side view, front of the house
Kichen
South-side view, front of the houseFriday, September 5, 2008
A whole year later.
Well we haven't updated in a year and boy oh boy how somethings have changed and others have not. If someone would have told us at the beginning of this process 2.5 years ago we would still be at this stage I would have told them they were nuts. Changed: Our original design company of HSpaceDB has gone out of business. Enough on that. Not Changed: we still haven't finalized the fence line disputes with the neighbors. Things are tied up with legal lot descriptions and title companies.
The silver-lining ? Our new design team of Chris Talvy and Hunter Gundersen of Imbue Designs have taken on our dream. The process of design and engineering is in full swing and we are now meeting with Imbue Designs once a month. The design is based on work started with the old team but now with Imbues newest contributions and floorplans. We choose the second design a sunken house with a full south facing roof and exterior wall. The budget will determined our hopes of a fully run solar home.
We are excited to be working with these guys and have full confidence that this will be one of the coolest homes in Holladay, Utah.
Tuesday, August 21, 2007
Don't fence me in
The silver lining is the boys are enjoying loops around the pumpkin patch, someday to be our kitchen.
Subscribe to:
Posts (Atom)