Tuesday, April 27, 2010

Floorplan

Sweet. Adult area, public area, kids area.


Monday, April 26, 2010

Schematic signed off


We finally signed off on schematic design. Interior walls might move around but the basic floor plan is set. The waterline engineering is almost complete with a few more tweaks. The final plat was presented today to the City of Holladay. We are hoping everything is in order and we can move ahead on getting all the paperwork finished. It has seemed along time coming.

Friday, April 9, 2010

Walk The Line

Spent the morning walking the proposed waterline with the engineer from Bush and Gudgell. Close to 830 feet of waterline must be installed to bring in fire protection to the new lot. On the design front things are getting closer to being done with schematic design. Our best guess for construction plans is July 15th. With any luck we will be breaking ground in August of this summer.